General Contractor: Tilden-Coil Constructors, Riverside, CA
Steel Fabricator: Vulcan Steel, Bloomington, CA
Steel Detailers:
Tekton Construction Services, Corona, CA
Warrior Detail, Warrior, AL
Select the images below to display full-size shop & erection dwgs in Adobe PDF format.
Anchor Bolt Plan 418 kb |
Framing Plan 452 kb |
Braced Frame 329 kb |
Columns 189 kb |
Hip Rafter 175 kb |
Jack Rafters 287 kb |
©2001-2009 Herman Mayfarth
Last updated Nov 09